Friday, April 15, 2011

Two Serendra April 2011 Construction Updates

Two Serendra photo taken April 7, 2011 courtesy of Aziza of SSC. Aston at Two Serendra being the yellow topped-off building shall be ready by 2012. Red Oak at Two Serendra being the building under construction (seen at the right most of the photo) shall be ready for occupancy by 2013. AS of this posting, these two buildings only have less than 20 units of a two and three bedroom mix in the inventory. This is due to the fact that the TWO SERENDRA No Downpayment PROMO was extended till April 25th. 

Meranti at Two Serendra (the soon to rise building in front of Red Oak) is the current building under pre-selling with studios, 1-Bedrooms and Penthouse units available for Sale. For Meranti, the Two Bedrooms are already sold out.

There is also an existing Housing Louan promo for Ayala Land property buyers via BPI.




 ALI-BPI Promo. Interest rates valid for ALVEO and Ayala Land Premiere only. For Payment Option 20/80 ~ 20% Downpayment then 80% Bank Proceeds from BPI. 5 Days Approval.

For more on Serendra, please visit our page: http://www.ayalalandrealestate.com/

No comments:

LinkWithin

Related Posts with Thumbnails
Inquire Here!

Name

First

Last
Email
Phone Number
Please specify country code and area code.
Country
Property Specifications
Please state the property you are inquiring about as well as your desired specifications such as lot size for landed properties or unit area or number of bedrooms for condominiums as well as other pertinent details.
Projected Budget
Please indicate PHP amount
Timeline for Turnover
 Ready For Occupancy 
 Ready within 1 year or less 
 Ready within 2 years to 3 years 
 Ready within 4 years or more 
Please choose your preferred time line for this property investment
Image Verification
captcha
Please enter the text from the image:
[Refresh Image] [What's This?]